Sixth Form Centre, Wellington College
Contractor
Feltham Construction Ltd
Architect
MICA Architects
Duration
May 2024
JCW Acoustic Flooring supplied and installed the 25mm GenieBoard and 10mm GenieMat FF10 by Pliteq at the new Sixth Form Centre at Wellington College.
The acoustic flooring system was installed across the first and second floors, covering over 450m² of the new building.
This system provides effective impact sound reduction while creating a stable and durable
subfloor suitable for the final floor finishes, helping to support a comfortable learning environment for students and staff.